Occupational Safety Test for Chief Commander Professional Development

The test results will be sent to your Email. Please fill in the information completely.

(Rate us here)

Question 1: Contents and procedures for acceptance of completed construction items and construction works put into use

Question 2: The construction warranty period is specified

Question 3: Content of construction quality management of contractors

Question 4: Basis for acceptance of construction work

Question 5: Content of construction survey task

Question 6: Basis for acceptance of construction results report

Question 7: The meaning of construction classification (according to construction law under Decree 209)

Question 8: According to the Construction Law and Decree 209, how are construction works classified?

Question 9: State management content includes the following parts:

Question 10: The content of the explanation section of the construction investment project includes:

Question 11: Before implementation, a construction project must have a construction schedule that aligns with the overall approved project schedule.

Question 12: For any construction project of any scale and duration, which of the following answers is correct regarding the construction progress?

Question 13: Which of the following entities is responsible for establishing a detailed construction schedule?

Question 14: Which of the following answers is correct in speeding up construction progress according to the request?

Question 15: Which of the following entities is responsible for safety measures for people and structures at construction sites?

Question 16: When there is a labor safety incident, which of the following entities must be responsible for handling and reporting to the state management agency on labor safety?

Question 17: Who is responsible for the covering measures to ensure safety and environmental sanitation during the transportation of construction materials and waste according to which of the following answers is correct?

Question 18: If a construction contractor violates environmental protection regulations, which of the following entities has the right to suspend construction and require compliance with environmental protection regulations?

Question 19: Risk management in construction investment project implementation is carried out in which phase according to the correct answer below?

Question 20: The investor approves the construction survey tasks.

Question 21: Total investment in construction of a project includes expenses:

Question 22: The investor approves the technical design.

Question 23: The investor approves the construction drawing design.

Question 24: The investor must approve the construction methods prepared by the construction contractor before commencing construction.

Question 25: The subcontractor is not required to have a quality management system as stipulated.

Question 26: The construction contractor uses its own specialized construction laboratory or hires the specialized construction laboratories of the construction supervision contractor through a contract to perform tests that the contractor’s own laboratory cannot conduct.

Question 27: The general contractor is not responsible to the investor or under the law if an incident occurs in the project due to the fault of a subcontractor.

Question 28: Due to insufficient personnel or transportation means, the design contractor hires another design consulting organization to perform author supervision.

Question 29: The design contractor participates in the acceptance of work for construction tasks that are difficult to correct defects in subsequent work, such as underground work or hidden parts of important load-bearing project components, when requested by the investor.

Question 30: In the as-built drawings, only the full name and signature of the person who prepared the as-built drawings and the legal representative of the construction contractor are included.

Question 31: When accepting construction work, the acceptance record includes the signatures of both the construction supervisor of the investor and the person in charge of quality management of the investor (Project Management Board or project management consultant).

Question 32: In cases where the investor is not the manager or user of the project, when accepting the completion of a project item or the construction project for use, the investor may invite the project manager or user to witness the acceptance if requested.

Question 33: The investor does not establish a Project Management Board or hire a project management consultant even though the project has an investment of over 7 billion VND.

Question 34: The construction contractor is responsible for preparing the maintenance procedures for the construction project.

Question 35: Decree 02/2006/ND-CP stipulates that the warranty period for apartment buildings is 60 months.

Question 36: Due to the linear nature of the construction project, it is impossible to clear the entire site. Therefore, if only alternating sections along the route are cleared, construction can commence.

Question 37: The investor is not responsible when the construction contractor is found to have reduced 50% of the reinforcement in bored piles because a supervision consultant was hired.

Question 38: Before inspecting the reinforcement placed in the frame beams, the investor requires the construction contractor to internally inspect whether the fabrication and installation of the reinforcement work are correct.

Question 39: The condition to start the builder must be:

Question 40: If the approved construction planning is changed, affecting the project location but not exceeding the total investment, then: