Occupational Safety Test for Construction Supervision Professional Development

The test results will be sent to your Email. Please fill in the information completely.

(Rate us here)

Question 1: What is the stipulated warranty period for construction works?

Question 2: What is the content of construction quality management of the contractor?

Question 3: Basis for acceptance of construction work

Question 4: Content of construction survey task

Question 5: According to construction laws and Decree 209, how are construction works classified?

Question 6: State management content includes the following parts?

Question 7: What does the construction investment project description include?

Question 8: What types of drawings are included in basic design drawings?

Question 9: Principles of construction supervision?

Question 10: Requirements for construction supervision?

Question 11: If complete, the quality management system of a construction supervision contractor includes the following types of staff?

Question 12: Checking the construction contractor's capacity to match the bidding and co-construction documents includes the following contents?

Question 13: Construction volume supervision includes the following contents?

Question 14: The inspection of the quality of structural materials or products before putting them into use in construction and installation is carried out according to which basic content according to the provisions of Decree No. 209/2004/ND-CP?

Question 15: How does the contractor prove that the materials used in construction and installation ensure quality according to design regulations?

Question 16: What method is used to check the quality of materials? What is the basis for assessing their quality?

Question 17: What methods are applied to check the quality of prefabricated components or products before putting them into construction?

Question 18: Which non-destructive testing method is commonly used when testing the quality of components or products?

Question 19: When collecting information about a project, what basic survey steps are usually taken?

Question 20: On what basis does the controller supervise the construction inspection work?

Question 21: Construction survey work includes which of the following contents?

Question 22: Which of the following documents require conducting field construction surveys?

Question 23: Does the investor have to review and approve the request for construction survey inspection?

Question 24: Which stage of construction requires surveying work?

Question 25: The quality of a topographic survey map is made on different aspects.

Question 26: Post-work duties?

Question 27: What is the purpose of completion measurement and drawing?

Question 28: How is bored pile quality management and inspection performed?

Question 29: Evaluation of bored pile construction quality based on ultrasonic wave characteristics (Ultrasonic method)

Question 30: What is the number 1 principle of supervision consulting?

Question 31: What is quality construction?

Question 32: When is the responsibility of a construction supervision consultant completed?

Question 33: In the following cases, which condition usually provides the best soil compaction efficiency?

Question 34: When is soil compaction most effective?

Question 35: What is the basis for locating the project?

Question 36: How to know the pressure on one pile head during pile driving?

Question 37: When does the pile meet the requirements?

Question 38: In bored pile construction, when is it safest to drop the steel cage?