Question 1: According to the Construction Law and guiding documents, the Investor:

Question 2: When conducting appraisal of the Project's Basic Design, it is only necessary to consider:

Question 3: Projects with the following capital levels (excluding land use fees) only require an Economic-Technical report:

Question 4: When the Investor directly manages the project, which of the following total investment levels requires the establishment of a Project Management Unit:

Question 5: Individuals participating in consulting activities in construction must possess a professional practice certificate appropriate to the job:

Question 6: Who approves the bidding results after the evaluation has been completed?

Question 7: The technical evaluation of Construction and General Contractor bidding packages (excluding design-build contracts) is conducted:

Question 8: At the time of bid closing, if there are no more than two bidders submitting and participating in the bidding process:

Question 9: Is the lowest evaluated price for a construction bidding package:

Question 10: Contracts in construction activities are economic contracts. True or False?

Question 11: Is it True or False that a contract in construction activities is signed after completing the selection of a contractor and concluding contract negotiations with the winning contractor?

Question 12: In case of a joint venture contractor, the members of the joint venture must have a joint venture agreement, and the contract must have the signatures of all members participating in the joint venture. True or False

Question 13: Construction contract documents include the contents according to which of the following correct answers?

Question 14: Which of the following entities is responsible for establishing a detailed construction schedule?

Question 15: Accelerating the construction progress of a project according to which of the following requirements is correct?

Question 16: Construction contractors are responsible for establishing construction maintenance procedures.

Question 17: Decree No. 02/2006/ND-CP stipulates that the warranty period for apartment buildings is 60 months.

Question 18: Due to the characteristics of linear construction projects, it is not possible to clear the entire site. Therefore, if only alternating sections on the route can be cleared, construction can begin. True or False?

Question 19: The investor is not responsible when the construction contractor is found to have reduced 50% of the amount of steel reinforcement in the bored pile because he hired a supervision consultant. True or False?

Question 20: Before accepting the steel bars placed in the frame beam, the investor requires the construction contractor to internally inspect the steel bar processing and installation work, is it True or False??

Question 21: Construction cost estimates are based on which construction unit price?

Question 22: General costs in construction estimates are calculated by:

Question 23: For projects with construction time ≤ 2 years, the contingency cost in the construction estimate is determined by the ratio:

Question 24: Review and approval of construction project estimates is under the authority of

Question 25. If a construction contractor violates environmental protection regulations, which of the following entities has the right to suspend construction and require compliance with environmental protection regulations?

Question 26. Risk management in construction investment project implementation is carried out in which phase according to the correct answer below?

Question 27: All construction investment projects using state capital after completion and handover for use and exploitation:

Question 28: Investment capital settlement approval documents

Question 29: The person approving the final settlement of investment capital for construction of important national projects for which the National Assembly decides on investment policy is:

Question 30: Payment for construction work is based on: